// illustrative deliverable

ILLUSTRATIVE MANAGEMENT REPORT

This sample shows the structure and level of decision support delivered by the Sprint. It is an illustrative template, not a client result, benchmark, testimonial, or performance claim.

All figures are placeholders used to demonstrate the report structure. A client report uses the client’s declared boundary, source records, evidence grade, uncertainty, and exclusions.

ILLUSTRATIVE · FICTITIOUS FIGURES · NOT A CLIENT RESULT

Fictitious laboratory: analytical testing laboratory, 22 FTE, 640 m², reporting year 2025.

01Executive decision summary

Within the declared boundary, the laboratory's operational footprint for 2025 is estimated at 95.5 tCO2e (plausible range 80.6 to 110.4), or 4.34 tCO2e per FTE, linked to €235,500 of annual operating and purchasing cost. Ventilation, fume hoods and consumables account for 59% of emissions. Five actions are estimated to save €29,600 per year and 18.6 tCO2e (20% of the baseline) for €11,400 of investment, a simple payback of about 5 months.

95.5 tCO2e
± 16 %
4.34 tCO2e
Saving EUR/yr
€29,600

02Declared boundary and data quality

Included

  • Electricity for ventilation, fume hoods, cold storage and equipment
  • Natural gas for space heating
  • Mains and purified water
  • Hazardous and general waste
  • Laboratory gases
  • Consumables and chemicals (spend-based)

Excluded (declared)

  • Business travel and staff commuting
  • Embodied emissions of capital equipment
  • Cloud and IT services
  • Shared building areas outside the laboratory floor

Overall data quality: carbon-weighted Grade B, uncertainty about ±16%.

03Cost and carbon hotspots

SourcetCO2eShareCost EUR/yrEvidence
Ventilation and fume hoods (sub-metered electricity)31.233 %€33,800A
Consumables and chemicals24.826 %€148,000C
Cold storage and equipment (allocated electricity)18.619 %€20,100B
Space heating (natural gas)14.115 %€9,700B
Hazardous and general waste3.94 %€12,400A
Laboratory gases2.32 %€8,600C
Mains and purified water0.61 %€2,900B
Total95.5100 %€235,500B

04Prioritised action register

#ActionSaving EUR/yrtCO2e/yrInvestment EURDecision ownerEvidence to confirm
1Sash-closure routine and night setback on fume hoods€9,5008.8€4,000Lab manager + estatesSub-meter readings before and after
2Reusable glassware for three high-volume methods; supplier take-back€11,0003.1€6,500ProcurementPurchase records over 6 months
3Consolidate -80 °C freezers and raise set-point to -70 °C where sample policy allows€4,2003.9€0Group leadersFreezer inventory and power logging
4Timed shutdown of 14 non-critical instruments€2,6002.4€900Lab managerTimer schedule and spot metering
5Reduce mis-sorted hazardous waste€2,3000.4€0Safety officerWaste contractor notes
Total€29,60018.6€11,400

05Evidence gaps and next-step options

Evidence gaps

  • Consumables are spend-based (Grade C): request supplier-specific emission data for the top 10 items.
  • Gas cylinders lack supplier data (Grade C): request delivery records with gas composition.
  • Cold-storage electricity is allocated (Grade B): a two-week power logging would move it to Grade A.

Next-step options

  1. Implement actions 1 to 3 and re-measure after one quarter.
  2. Track progress in the software, or repeat the Sprint next year.
  3. Commission an evidence review only if a tender or customer asks for documented evidence.

Figures in this sample are fictitious and are rounded. A client report uses the client's own boundary, records, evidence grades and exclusions.